Team Laboratory Chemical

Detroit Lakes, MN

COMPANY OVERVIEW

About Team Laboratory Chemical

Team Laboratory Chemical, a recognized leader in the chemical business since 1977, specializes in solving your everyday problems with "Innovative Solutions". Team Lab developed and manufactures BASE ONE®, a patented*, popular road improvement product. BASE ONE® is a concentrated liquid that is added to water and then incorporated in the base material. BASE ONE® is used in new construction, reconstruction, full depth reclamation, and chip seal application, or used to simply stabilize aggregate surface roadways.

Contact

PO Box 1467
Detroit Lakes, MN
USA
http://www.teamlab.net
800.522.8326

More Info on Team Laboratory Chemical

Team Laboratory Chemical, a recognized leader in the chemical business since 1977, specializes in solving your everyday problems with "Innovative Solutions". Team Lab developed and manufactures BASE ONE®, a patented*, popular road improvement product. BASE ONE® is a concentrated liquid that is added to water and then incorporated in the base material. BASE ONE® is used in new construction, reconstruction, full depth reclamation, and chip seal application, or used to simply stabilize aggregate surface roadways. BASE ONE® increases the base strength, reduces maintenance, and preserves the base preparation work prior to the overlay process. *Patent No. 7651294 and other patents pending

Products

BASE ONE Injecting Product Profile Primary Photo1_0
Recyclers / Reclaiming Machines / Soil Stabilizers

Liquid concentrate stabilizer

Aug. 7, 2019
BASE ONE is a liquid concentrate stabilizer from Team Laboratory Chemical used to add strength, stability and improve constructability in aggregate and reclaimed (FDR) road base...
teamlabspraying_RS
Road Construction

Base stabilizer

May 14, 2009
Team Laboratory Chemical Corp. has developed BASE ONE, an inexpensive liquid aggregate base stabilizer that is applied with water. BASE ONE Aggregate Base Stabilizer is incorporated...

Case Studies

Aggregates

County and Townships Team up to Save Money!

Nov. 28, 2023
Becker County, Minnesota and Townships in the county work together for better end result.
McKenzie Co #36 Picture 1
Soil Stabilization

Base stabilizer addition saves money for county in North Dakota

Oct. 29, 2020
McKenzie County, North Dakota Public Works Director Suhail Kanwar, P.E., had a reconstruction project planned for County Road #36 in 2019. The original design for McKenzie County...
Wilkin Co #3 Reclaim and Injecting Photo 1_800px
Soil Stabilization

Selected stabilizer saves money for county in Minnesota

April 16, 2020
Wilkin County, Minnesota Engineer Brian Noetzelman has years of experience with stabilized full depth reclamation (SFDR) projects. The county had a SFDR project scheduled for ...
Team Lab COW Oct
Gravel Roads

Gravel road system in Minnesota county upgraded with base material stabilizer

Oct. 15, 2019
In Wilkin County, Minnesota, Engineer Brian Noetzelman, P.E., and Assistant Engineer Steve Neppl have approximately 300 miles of gravel surfaced roads they maintain. Every year...
745467978001_3128498662001_thumbnail-for-video-2686980295001
Recyclers / Reclaiming Machines / Soil Stabilizers

Stabilized FDR material outperforms non-stabilized FDR material in Minnesota

April 19, 2019
Tim Erickson, Lake of the Woods County, Minn., engineer, was looking for the best solution to rehabilitate County State Aid Highway (CSAH) #8. This was a 5.2-mile project in the...
Recyclers / Reclaiming Machines / Soil Stabilizers

Base stabilizer cuts costs on North Dakota road project

April 17, 2018
Eric Urness, P.E., central regional vice president with Interstate Engineering in Mandan, N.D., was working on plans to reconstruct a 11.5-mile section of BIA Rte. 6 from 86th...
Recyclers / Reclaiming Machines / Soil Stabilizers

Minnesota county tests stabilized vs. non-stabilized FDR on same roadway

March 29, 2018
Wilkin County, Minn., has stabilized an estimated 80 miles of gravel surface roadways and 30 miles of full-depth reclamation projects with the same base stabilizer. The county...
Blade Mix Pic 2 051616
Gravel Roads

Base stabilizer enhances properties of gravel roads in Minnesota

May 18, 2016
Polk County, Minn. has approximately 400 miles of gravel roads that it maintains. “Every year the county would spend money adding gravel that was lost during the winter snowplowing...
Clinton Co. Pic 1
Asphalt

Clinton County, Iowa, finds a stabilized road resurfacing solution

May 29, 2015
Clinton County, Iowa, Engineer Todd Kinney was looking for a solution for 250th Street, a 2-mile aggregate surfaced road that serves mainly residential and agricultural property...
Washburn_Co_CTH_B_Photo_2
Pavement Maintenance

Washburn County injects strength into Trunk Highway B

July 17, 2014
Washburn County (Wis.) Highway Department Commissioner Jon Johnson, P.E., oversees 200 miles of paved roads and offers guidance to area townships. Each year a number of these ...

Videos

Sponsored

BASE ONE Reduces Aggregate Loss and Maintenance on Gravel Roads

Dec. 18, 2023
BASE ONE is an economical liquid concentrate that is applied to your gravel roadways to reduce aggregate loss, maintenance and create a better driving surface!
Teamlab Still1
Aggregates

The Best 13 Cents You'll Ever Spend

Nov. 29, 2022
Team Laboratory has developed a very economical solution for stabilized aggregate and reclaimed base material. BASE ONE® helps improve strength, stability, constructability and...

Request More Information

By clicking above, I acknowledge and agree to Endeavor Business Media’s Terms of Service and to Endeavor Business Media's use of my contact information to communicate with me about offerings by Endeavor, its brands, affiliates and/or third-party partners, consistent with Endeavor's Privacy Policy. In addition, I understand that my personal information will be shared with any sponsor(s) of the resource, so they can contact me directly about their products or services. Please refer to the privacy policies of such sponsor(s) for more details on how your information will be used by them. You may unsubscribe at any time.

All content from Team Laboratory Chemical

Bowman County Photo 1
Highway Maintenance

N.D. rocky road gets a stabilizing hand

April 25, 2014
Bowman County, N.D., Highway Superintendent Neil Hofland was facing 6 miles of high-maintenance aggregate for 94th Street SW, which leads to a saltwater disposal well and receives...
Kirkwood Pueblo West After Photo
Home

Pueblo West, Colo., turns to base stabilizer to rehab road

Feb. 21, 2014
Jerry Brown, street and road manager for the city of Pueblo West, Colo., needed a solution to a very problematic Kirkwood Drive.   “Kirkwood Drive is a high traffic volume...
Maintenance

Cass County, Minn., strengthens road for haul trucks

July 19, 2013
Kris Lyytinen, Cass County’s assistant engineer, looked for a solution for a troubled 5.7-mile gravel road section of CSAH No. 50 linking TH 371 and 34. While the roadway has ...
Maintenance

Wilkin County, Minn., finds solution for exhausted sugar-beet route

May 17, 2013
Steve Neppl, assistant county engineer for Wilkin County, Minn., and Dan Swedlund, maintenance superintendent, were faced with an 8-mile maintenance problem on CSAH 32. The roadway...
First Photo Deroxe Road Case of the Week 021813 (2)
Aggregates

Base stabilization and chip seal tame loose gravel road

Feb. 22, 2013
Lake Eunice Township was looking for a solution for a section of gravel-surface road that connects two north- and southbound bituminous-surface roadways. This section of Deroxe...
Billings Case of the Week Photo 2
Maintenance

Billings County, N.D., finds a solution for troubled Gas Plant Road

July 13, 2012
Gas Plant Road is an 11-mile-long, 28-ft-wide road in Billings County, N.D. This roadway is populated by several farmsteads and ranches. The traffic has significantly increased...
Maintenance

Minn. county selects alternative surface treatment for gravel roadway

May 11, 2012
A 6-mile gravel segment of Becker County, Minn., CSAH No. 35 had very high annual road-maintenance costs due to several resorts, logging trucks and an ADT of 280. The road surface...
Pavement Maintenance

Minnesota’s County Road No. 7 reconstructed to support 10-ton traffic

Feb. 17, 2012
Minnesota’s Kandiyohi County Road No. 7 was in need of reconstruction. “This segment of the grading and bituminous surfacing project was projected to receive a lot of heavy...
Home

Douglas County, Kan., strengthens 1-mile section

July 15, 2011
Keith Browning, P.E., director/county engineer of Douglas County in Lawrence, Kan., watches over about 600 miles of county road. Only 33 miles have an aggregate surface. The ...